Putting your ideas down on paper

 

Optimum planning of bathroom renovation projects

When you intend to renovate your bathroom, you are confronted with the task of making the best out of the given situation and possibilities. Here we would like to outline the aspects which are important in order to ensure that your work with planners, architects and craftsmen produces the best possible results.

On-wall installation

You'll gain increased scope for the layout of the bath and WC area by using "on-wall installation". It allows the fast and easy installation in just a few hours of all the piping etc. without the need to open up walls or hammer out slots. Depending on the system chosen, the frame construction is concealed behind brickwork or gypsum plasterboards which are suitable for damp rooms, and then tiled over. The washbasin, WC, bidet, urinal, etc. is then attached to this facing wall.

 

Practical side effect

The WC cistern can also be flush-mounted in the facing wall. At the same time, the shelf surfaces which are produced at a height of 80, 100 or 120 cm can be used for practical or decorative